ZHANG Zhe, HU Chen, QIAN DejunZHANG Zhe, et al., “Efficient Workload Adaptive Scheme forLow-power Real-time Systems,” Chinese Journal of Electronics, vol. 19, no. 4, pp. 603-607, 2010,
Citation: ZHANG Zhe, HU Chen, QIAN DejunZHANG Zhe, et al., “Efficient Workload Adaptive Scheme forLow-power Real-time Systems,” Chinese Journal of Electronics, vol. 19, no. 4, pp. 603-607, 2010,

Efficient Workload Adaptive Scheme forLow-power Real-time Systems

  • Received Date: 2009-01-01
  • Rev Recd Date: 2010-03-01
  • Publish Date: 2010-11-25
  • Low-power schemes for real-time systemsthat dynamically vary CPU speed and voltage dependingon the probability distribution of the task’s work requirementwere implemented in previous studies to save energy.However, they did not consider the interrelationshipof the probability distribution between running tasks’work requirement to further reduce the power consumption.This paper presents a new low-power DVS schemeto combine all running tasks’ scheduling into a single optimizationproblem such that the frequency schedule of eachtask is determined by the system workload. The computationof the frequency assignment is optimized based on theprobability distribution of the workload’s clock demands.This DVS scheme keeps the real-time system schedulablebecause the longest time duration to execute these clockcycles is restricted to meet all tasks’ deadlines. Simulationresults show that it effectively reduces at least 30% lessenergy than previous studies without any negative effecton performance.
  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (723) PDF downloads(672) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return