Citation: | ZHANG Long, LIU Tao, LIU Min, et al., “Scheduling Semiconductor Wafer Fabrication Using a New Fuzzy Association Classification Rules Based on Dynamic Fuzzy Partition,” Chinese Journal of Electronics, vol. 26, no. 1, pp. 112-117, 2017, doi: 10.1049/cje.2016.11.006 |
Thomas W. Sloan, "Shop-floor scheduling of semiconductor wafer fabs:Exploring the influence of technology, market, and performance objectives", IEEE Transactions on Semiconductor Manufacturing, Vol.16, No.2, pp.281-289, 2003.
|
Appa Iyer Sivakumar and Amit Kumar Gupta, "Online multiobjective Pareto optimal dynamic scheduling of semiconductor back-end using conjunctive simulated scheduling", IEEE Transactions on Electronics Packaging Manufacturing, Vol.29, No.2, pp.99-109, 2006.
|
Garey M.R. and Johnson D.S., "Computers and intractability:A guide to the theory of np-completeness", W.H. Freeman & Company, 1979.
|
Chengtao Guo, Zhibin Jiang, Huai Zhang, et al., "Decomposition-based classified ant colony optimization algorithm for scheduling semiconductor wafer fabrication system", Computers & Industrial Engineering, Vol.62, No.1, pp.141-151, 2012.
|
H. Zhang, Z. Jiang and C. Guo, "Simulation based realtime scheduling method for dispatching and rework control of semiconductor manufacturing system", IEEE International Conference on Systems, pp.2901-2905, 2007.
|
R. Billings and J.J. Hasenbein, "A survey of applications of fluid models to semiconductor fab operations", MASM 2000, Tempe, Arizona, 2000.
|
M.C. Zhou and D. Jeng, "Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems:A petri net approach", IEEE Transactions on Semiconductor Manufacturing, Vol.11, No.3, pp.333-357, 1998.
|
Amir Noroozi, Hadi Mokhtari and Isa Nakhai Kamal Abadi, "Research on computational intelligence algorithms with adaptive learning approach for scheduling problems with batch processing machines", Neurocomputing, Vol.101, No.1, pp.190-203, 2013.
|
Hao Jinghua, Liu Min and Wu Cheng, "Particle swarm optimization for parallel machine scheduling problem with machine eligibility constraints", Chinese Journal of Electronics, Vol.19, No.1, pp.103-106, 2010.
|
O.B. Senties, C. Azzaro-Pantel, L. Pibouleau, et al., "A neural network and a genetic algorithm for multiobjective scheduling of semiconductor manufacturing plants", Industrial & Engineering Chemistry Research, Vol.48, No.21, pp.9546-9555, 2009.
|
Liu Min, Hao Jinghua and Wu Cheng, "A new genetic algorithm for parallel machine scheduling problems with procedure constraints and its applications", Chinese Journal of Electronics, Vol.15, No.3, pp.463-466, 2006.
|
Tsung-Che Chiang, "Enhancing rule-based scheduling in wafer fabrication facilities by evolutionary algorithms:Review and opportunity", Computers & Industrial Engineering, Vol.64, No.1, pp.524-535, 2013.
|
R. Agrawal, H. Mannila, R. Srikant, et al., "Fast discovery of association rules", American Association for Artificial Intelligence, Menlo Park, CA, USA, pp.307-328, 1996.
|
M. Liu, D.G. Chen, C. Wu, et al., "Fuzzy reasoning based on a new fuzzy rough set and its application to scheduling problems", Computers & Mathematics with Applications, Vol.51, No.9-10, pp.1507-1518, 2006.
|
Y.-C. Hu, R.-S. Chen and G.-H. Tzeng, "Finding fuzzy classification rules using data mining techniques", Pattern Recognition Letters, Vol.24, No.1-3, pp.509-519, 2003.
|
Y.-C. Hu, R.-S. Chen and G.-H. Tzeng, "Mining fuzzy association rules for classification problems", Computers & Industrial Engineering, Vol.43, No.4, pp.735-750, 2002.
|
Zhang Long, "Study on intelligent scheduling methods for microelectronics production process", Ph.D. Thesis, Zhejiang University, China, 2014.
|
QuanKe Pan, Ling Wang and Liang Gao, "A chaotic harmony search algorithm for the flow shop scheduling problem with limited buffers", Applied Soft Computing, Vol.11, No.8, pp.5270-5280, 2011.
|
M.F. Neuts, "A general class of bulk queues with Poisson input", Management Science, Vol.38, No.3, pp.759-770, 1967.
|