Citation: | LIU Shufen, WANG Pengfei, ZHANG Jiachen, “An Improved Biogeography-Based Optimization Algorithm for Blocking Flow Shop Scheduling Problem,” Chinese Journal of Electronics, vol. 27, no. 2, pp. 351-358, 2018, doi: 10.1049/cje.2018.01.007 |
D.Y. Bai and L.X. Tang, "Two asymptotically optimal lower bounds for flow shop problem", Chinese Journal of Electronics, Vol.18, pp.625-629, 2009.
|
C. Zhou, L. Gao and H.B. Gao, "Particle swarm optimization based algorithm for permutation flow shop scheduling", Acta Electronica Sinica, Vol.34, pp.2008-2011, 2006. (in Chinese)
|
Y. Tian and D.Y. Liu, "A hybrid particle swarm optimization method for flow shop scheduling problem", Acta Electronica Sinica, Vol.39, pp.1087-1093, 2011. (in Chinese)
|
C. Wang, S. Song and J.N.D. Gupta, et al., "A threephase algorithm for flowshop scheduling with blocking to minimize makespan", Computers & Operations Research, Vol.39, pp.2880-2887, 2012.
|
L. Wang, K.P. Quan and P.N. Suganthan, et al., "A novel hybrid discrete differential evolution algorithm for blocking flow shop scheduling problems", Computers & Operations Research, Vol.37, pp.509-520, 2010.
|
I. Ribas, R. Companys, and X. Tort-Martorell, "An iterated greedy algorithm for the flowshop scheduling problem with blocking", OMEGA, Vol.39, pp.293-301, 2011.
|
I. Ribas and R. Companys, "Efficient heuristic algorithms for the blocking flow shop scheduling problem with total flow time minimization", Computers & Industrial Engineering, Vol.87, pp.30-39, 2015.
|
D. Karaboga, B. Gorkemli and C. Ozturk, et al., "A comprehensive survey:Artificial bee colony (ABC) algorithm and applications", Artificial Intelligence Review, Vol.42, No.1, pp.21-57, 2014.
|
D. Lei, "Multi-objective artificial bee colony for interval job shop scheduling with flexible maintenance", The International Journal of Advanced Manufacturing Technology, Vol.66, No.9-12, pp.1835-1843, 2012.
|
J. Li and Q. Pan, "Solving the large-scale hybrid flow shop scheduling problem with limited buffers by a hybrid artificial bee colony algorithm", Information Sciences, Vol.316, pp.487-502, 2015.
|
D.P. Ronconi, "A branch-and-bound algorithm to minimize the makespan in a flowshop problem with blocking", Annals of Operations Research, Vol.138, pp.53-65, 2013.
|
D. Simon, "Biogeography-based optimization", IEEE Trans. Evolutionary Computation, Vol.12, No.6, pp.702-713, 2008.
|
D.C. Tran and Z.J. Wu, "Adaptive multi-layer particle swarm optimization with neighborhood search", Chinese Journal of Electronics, Vol.25, No.6, pp.1079-1088, 2016.
|
H.N. Xuan, R.C. Zhang and S.S. Shi, "An efficient cuckoo search algorithm for system-level fault diagnosis", Chinese Journal of Electronics, Vol.25, No.6, pp.999-1004, 2016.
|
D. Simon, "A dynamic system model of biogeography-based optimization", Applied Soft Computing, Vol.11, No.8, pp.5652-5661, 2011.
|
W. Guo, L. Wang and Q. Wu, "An analysis of the migration rates of biogeography-based optimization", Information Sciences, Vol.254, No.1, pp.111-140, 2014.
|
D. Simon, M. Ergezer and D. Du, et al., "Markov models for biogeography-based optimization", IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics), Vol.41, No.1, pp.299-306, 2011.
|
D. Simon, R. Rarick and M. Ergezer, et al., "Analytical and numerical comparisons of biogeography-based optimization and genetic algorithms", Information Sciences, Vol.181, No.7, pp.1224-1248, 2011.
|
G. Xiong, D. Shi and X. Duan, "Enhancing the performance of biogeography-based optimization using polyphyletic migration operator and orthogonal learning", Computers & Operations Research, Vol.41, pp.125-139, 2014.
|
A. Bhattacharya and P. Chattopadhyay, "Solving complex economic load dispatch problems using biogeography-based optimization", Expert Systems with Applications, Vol.37, pp.3605-3615, 2010.
|
S.H.A. Rahmati and M. Zandieh, "A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem", the International Journal of Advanced Manufacturing Technology, Vol.58, No.9-12, pp.1115-1129, 2012.
|
J. Framinan, R. Leisten and R. Ruiz, Manufacturing Scheduling Systems:An Integrated View on Models, Methods, and Tools, Springer, London, 2014.
|
M. Nawaz, E.E.J. Enscore and I. Ham, "A heuristic algorithm for the m machine, n-job flow shop sequencing problem", Omega, Vol.11, pp.91-95, 1983.
|
E. Taillard, "Bench marks for basic scheduling problems", European Journal of Operational Research, Vol.64, pp.278-285, 1993.
|